MMC terms
5S
active building
Advanced Building Material (ABM)
Advanced Product Quality Planning (APQP)
alternative method tender
Arm’s-Length Body (ALB)
Association for Project Management (APM)
Augmented Reality (AR)
automation, onsite
Bill of Materials (BOM)
Building Energy Modelling (BEM)
Building Information Modelling (BIM)
Building Research Establishment Environment Assessment Methodology (BREEAM)
carbon nano-tube (CNT)
carbon zero
Common Data Environment (CDE)
configuration
configuration management
Construction Industry Training Board (CITB)
Construction Leadership Council (CLC)
delivery phase
design development stage
Design Failure Mode Effects Analysis (DFMEA)
Design for Manufacture (DfM)
Design for Manufacture and Assembly (DfMA)
deskill
Factory Engineered Concrete (FEC)
Failure Mode and Effects Analysis (FMEA)
future skills needs
Globally Unique Identifier (GUID)
hybrid
industry (construction)
information management framework
Infrastructure and Projects Authority (IPA)
Internet of Things (IoT)
Key Performance Indicator (KPI)
Life Cycle Assessment (LCA)
Life Cycle Cost (LCC)
Manufactured Nanotechnology Product (MNP)
Manufacturing Readiness Level (MRL)
Micro/Nano Electromechanical System
Modern Methods of Construction (MMC)
Modern Methods of Construction (MMC) definition framework
non-volumetric unit
Offsite Manufacturing (OSM)
onsite
Permission in Principle (PiP)
Porter’s Value Chain
Pre-Manufactured Value (PMV)
Process Failure Mode Effects Analysis (PFMEA)
productivity gap
Quality Functional Deployment (QFD)
Quality Management System (QMS)
Quality, Cost, and Delivery (QCD)
Research and Development (R&D)
reskill
RIBA Plan of Work [17]
Science, Technology, Engineering and Mathematics (STEM)
sequential tendering
Small and Medium-Sized Enterprise (SME)
Statistical Process Control (SPC)
Technology Readiness Level (TRL)
through-life costing
Total Cost of Ownership (TCO)
transforming construction challenge programme
Transforming Infrastructure Performance (TIP) [65]
Transport Infrastructure Efficiency Strategy (TIES) [66]
Unmanned Aerial Vehicle (UAV)
upskill
Virtual Reality (VR)
wearable technology (or devices)
Whole-Life Cost (WLC)
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.
























